Email link to this pagePrint this pageReduce font sizeIncrease font size
nosection
English

Super complaints 

On 7 June 2011 the Minister for Fair Trading announced that NSW Fair Trading and consumer group CHOICE would pilot an 18 month 'Super complaints' project.

The project will allow CHOICE to present evidence to NSW Fair Trading that a feature of a market for consumer goods or services is, or appears to be, significantly harming the interests of consumers. Fair Trading will then research and assess the issue and report on actions that may be taken to address the issue.

This project is based on a super complaints system operating successfully in the United Kingdom.

Free-range egg claims in NSW 

On 29 August 2013 CHOICE lodged its second super complaint with NSW Fair Trading regarding free-range egg claims in NSW.

NSW Fair Trading response to the CHOICE Super Complaint

Fair Trading has finalised its response to the CHOICE Super Complaint on free-range egg claims in NSW. The findings of the report and further work in this area to be conducted by Fair Trading, have been discussed with CHOICE. 

View or download the NSW Fair Trading response to the CHOICE Super Complaint on free-range egg claims in NSW (PDF size 349kb).

View or download the CHOICE submission Free-range egg claims in NSW (PDF size: 722kb)

Go to top of page iconTop of page

Electricity switching sites 

CHOICE has lodged a super complaint with NSW Fair Trading regarding energy switching websites.

NSW Fair Trading response to the CHOICE Super Complaint

Under the Memorandum of Understanding that establishes the Super Complaints process, NSW Fair Trading is required to publish a response on the issues raised.

Fair Trading has finalised its response to the CHOICE Super Complaint on electricity switching sites. The findings of the report and further work in this area to be conducted by Fair Trading, have been discussed with CHOICE. 

View or download the NSW Fair Trading response to the CHOICE Super Complaint on electricity switching sites (PDF size 440kb).

View or download the CHOICE submission Between a door-knock and cyber-space: The problems with electricity switching sites (PDF size: 983kb)

Go to top of page iconTop of page

Get a free copy of Adobe Acrobat Reader so you can access PDF versions of our information.

Email link to this pagePrint this pageReduce font sizeIncrease font size